TrackFinch 2.0 — production planning is hereRead the notes
TrackFinchvs

TrackFinch vs MRPeasy.

MRPeasy is cloud MRP for small manufacturers with fuller routing and capacity features. Here's where each one actually wins — honestly, because a comparison page that lies converts nobody twice.

MRPeasy is genuinely good small-manufacturer MRP with the formal machinery: routings, workstations, capacity planning, and costing that will satisfy a process engineer. The trade is ceremony — more structure to set up and maintain than many small shops will feed.

TrackFinch plans at the honesty level a 3–20 person shop actually runs: jobs, days, materials, due dates — no routing bureaucracy. And it covers the physical layer MRPeasy doesn't: tool checkouts, equipment maintenance, and QR labels on everything.

Choose MRPeasy if…

  • You want formal routings, workstation capacity, and detailed costing
  • Someone owns keeping routings and BOM revisions current
  • Process discipline is a feature, not a burden

Choose TrackFinch if…

  • You want the plan the floor will actually follow, this week
  • Tools and machines belong on the same ledger as materials
  • Setup ceremony is the reason past systems died

MRPeasy and TrackFinch, feature by feature.

Summarized at a category level as of mid-2026 — verify current details on their site.

CapabilityMRPeasyTrackFinch
Formal routings & workstationsDeliberately light
Capacity planning depthDays-and-hours honest
BOMs & purchasing
Tool & asset tracking
Maintenance schedules
Phone-first floor experienceTerminal-style
Time to first work orderDaysSame day

Frequently asked questions

Is TrackFinch "real MRP" without routings?

It computes material needs from BOMs, stock, and open orders — that's the MRP core. What it skips is routing/capacity formalism, which small shops usually approximate better with judgment than with models nobody updates.

When would you honestly recommend MRPeasy?

When routings and workstation capacity are the point — say, repetitive production with meaningful machine-loading decisions and someone who'll maintain the model. That's their lane and they're good in it.

Can we switch later if we outgrow either?

Both sides export cleanly to CSV. Starting light and graduating beats starting heavy and abandoning — the failure mode that kills most small-shop MRP is disuse, not underpowered features.

Decide with your own shop's data.

Import your real items and run TrackFinch beside MRPeasy for a week. Free for 14 days with full access.

Free for 14 days · Full access · Cancel anytime